27 questions on Level 2 electrical work in Sydney, grouped by the kind of job. If yours is not here, call 0485 824 714 and ask. No sales pitch, just a straight answer.

  • Same Day
    Call Out*

  • 24 Hour
    Electricians

  • All Payments
    Accepted

  • Licensed and
    Fully Insured

*Same day call out and the $0 call out fee are subject to availability, location and job type. Conditions apply, ask us when you book.

Level 2 electrical work in general

Start here if you are not sure whether your job is Level 2 at all.

What services do Level 2 electricians provide?

Level 2 electricians offer specialised services that connect your property to the electricity network. That includes meter installations and upgrades, overhead and underground service mains, consumer mains, private power poles, switchboard upgrades and disconnections. They are trained and licensed to work on the network side of complex residential and commercial electrical systems.

How do I know if I need a Level 2 electrician?

If the work touches the wires between the street and your switchboard, you need a Level 2 electrician. Common signs include a new meter or smart meter, an upgrade from single to three phase, a damaged or sagging service line, a private pole that needs replacing, a temporary builders supply, or a written notice from Ausgrid or Endeavour Energy. A regular electrician is not authorised to carry out that work.

Are Level 2 electricians licensed and insured?

Yes. Every Level 2 electrician must hold an electrical licence plus a separate Accredited Service Provider authorisation from the network operator, and must carry public liability insurance. Our team holds current accreditation and insurance, and we supply the compliance paperwork for every job we complete.

How long does Level 2 electrical work typically take?

Most jobs are completed in a single visit. A meter change or service line repair usually takes two to four hours, a switchboard upgrade takes most of a day, and a private pole replacement or underground mains install can take one to two days depending on access and trenching. We confirm the expected duration in your quote before we start.

Connection and service lines

Everything between the street and your switchboard.

Service LinesMore

Who owns the service line, me or the network?

The network owns the wires up to the connection point at your property. From that point to your switchboard, the service line is the property owner's responsibility, which is why repairs and replacements are quoted to you rather than fixed for free by Ausgrid or Endeavour.

Power Connect and DisconnectMore

Can you connect power to a brand new property?

Yes. A new connection needs the application lodged with Ausgrid or Endeavour, consumer mains run, a compliant switchboard and metering installed, then energising. It is the same process as a new development connection, just at a single-property scale.

Overhead Service LinesMore

My line looks low but it is not down. Is that urgent?

Treat it as urgent if it is within reach, over a driveway, or sagging noticeably lower than it used to be. A low line is a contact risk long before it falls. Keep people and vehicles clear and call us; do not try to lift or move it.

Underground Service LinesMore

Who does the digging, you or me?

We can do the whole job including trenching, or you can have the trench open already if there is an excavator on site for other work. If you dig it yourself it has to meet depth and bedding requirements, so talk to us before you start rather than after.

Point of Attachment RepairsMore

What actually is the point of attachment on my house?

It is the bracket or fixing where the overhead service line lands on your building, usually at the eaves or on a short mast above the roofline. It is the single most common thing cited on Ausgrid and Endeavour defect notices.

Overhead to Underground ConversionMore

When is the cheapest time to convert to underground?

While the ground is already open. If you are doing a driveway, landscaping, a pool or a knockdown rebuild, the trenching cost largely disappears into work you are paying for anyway. Converting as a standalone job is the expensive way to do it.

Consumer MainsMore

How do I know if my consumer mains are undersized?

Common signs are lights dimming when a large appliance starts, the main switch tripping under load, or an electrician telling you the cable feeding your board is smaller than the installation now needs. Older homes running modern loads are the usual case.

Private Power PolesMore

How do I know if the pole is mine?

If it stands on your property and carries the supply from the street to your building, it is a private pole and it is yours to maintain. Poles in the street or on the verge belong to the network. If you are unsure, send a photo and we will tell you.

Metering

New meters, meter changes and the network application behind them.

MeteringMore

Who pays for the meter, me or the retailer?

It depends why it is changing. Some retailer-driven changes are covered by them; owner-driven changes such as a supply upgrade, solar or a relocation are paid by the property owner. We quote the Level 2 work; your retailer covers their side.

Off Peak and Controlled Load MeteringMore

Will I lose my off peak tariff if the meter is replaced?

Not if it is handled deliberately. The circuit can be carried across to the new metering arrangement. It gets lost when nobody mentions it and the new arrangement is set up without it, which is why we ask about it before the job.

Smart Meter InstallationMore

Why does the installer say my switchboard needs work first?

Older boards were not built around modern metering. Asbestos backing, no main switch, insufficient space or non-compliant wiring all have to be dealt with before a new meter can go in safely. That is Level 2 and general electrical work, not the meter itself.

Supply capacity

More power, more circuits, or supply split across separate lots.

Power Supply UpgradesMore

How do I know I need a supply upgrade rather than a switchboard upgrade?

If breakers trip under normal load, or lights dim when big appliances start, the constraint is often the supply itself rather than the board. We calculate maximum demand and tell you which one is actually limiting you, rather than upgrading both by default.

Three Phase Power UpgradeMore

What can three phase do that single phase cannot?

It carries more total load and runs equipment designed for it: larger ducted air conditioning, workshop machinery, commercial kitchen gear and faster EV charging. For a typical home with normal appliances, single phase is usually sufficient.

EV Charger InstallationMore

Do I need a Level 2 electrician for an EV charger?

For the charger itself, a general electrician can do the installation. You need a Level 2 ASP when the supply has to change to support it: bigger consumer mains, a metering change or a conversion to three phase.

Supply Separation and SubdivisionMore

Does a granny flat need its own supply?

It depends how it is being used and approved. A separately occupied dwelling generally needs its own metering, while an extension used by the same household often does not. The approval conditions usually settle it.

Compliance and switchboards

Defect notices cleared and switchboards brought up to standard.

Electrical Defect NoticesMore

How long do I have to fix a defect notice?

The notice states the deadline, commonly 30 days to advise your intention and 60 days for the repairs, though urgent safety items can be much shorter. Read the dates on your notice, and if it is already close, tell us when you call.

Switchboard UpgradesMore

How do I know my switchboard needs upgrading?

Ceramic rewireable fuses, no safety switches, a board that is full with nowhere to add a circuit, scorch marks or a persistent burning smell. Any of those is a reason to have it looked at rather than waited on.

Switchboard and Meter Box RelocationMore

Where is the meter box allowed to go?

Somewhere with safe unobstructed access from outside, clear of hazards, at a compliant height and position. The distributor sets those requirements, so the new location is chosen from what is allowed rather than purely what suits the look of the house.

Urgent and after hours

Lost supply and unsafe wiring, answered around the clock.

Emergency Level 2 ElectricianMore

What should I do before you arrive?

Keep everyone well clear of any fallen or low wire and treat it as live. Do not touch the service line, the pole or the meter box. If there is fire or an immediate danger to life, call 000 first.

24 Hour Level 2 ElectricianMore

What is the difference between after hours and emergency work?

Emergency work is unplanned and urgent: the supply has failed or something is unsafe. After hours work is planned deliberately for a time outside business hours, usually so a business, building or tenancy does not lose power while it is operating.

Supply Fault FindingMore

Half my house has power and half does not. What causes that?

That pattern often points to a fault on one leg of the supply or a neutral problem rather than a tripped circuit inside the house. It is a supply-side symptom, which is why a general electrician may not be able to resolve it.

Projects and construction

Site power, subdivisions and larger network work.

Temporary Builders SupplyMore

How quickly can site power be connected?

Once the application is lodged and approved, the physical installation is usually a single visit. The lead time is the distributor side, so get it started as early as possible rather than the week the trades arrive.

New DevelopmentsMore

When should I involve a Level 2 on a development?

At design stage. Where the connection point lands, where the mains run and where the meters sit all affect the site layout and the build program. Bringing it in late is what causes redesign and delay.

Network checker

Are you on Ausgrid or Endeavour Energy?

Every Level 2 job is lodged with the network that owns the wires in your street, and the paperwork differs between the two. Type your suburb and we will tell you which one you are on. We are accredited for both, so either way you are covered.

A guide only. Network boundaries can split a single street, so we always confirm the network before we lodge anything.

Get in touch

Need a Level 2 electrician in Sydney?

Metering, service mains, private poles, defect notices and emergency call outs. Tell us what is happening and we will tell you what it takes, what it costs and when we can be there. No obligation either way.

Tap to call, 24/70485 824 714
  • Free quote, no obligation
  • A Level 2 electrician calls you back, not a call centre
  • Emergency jobs answered around the clock

Request a call back

Tell us what you need. We reply within 30 minutes during business hours.

No obligation. Your details are only used to answer your enquiry.

Call 0485 824 714Free quote
Sydney Level 2 Electrician5.014 Google ReviewsRated 5.0 out of 5 from 14 Google reviews